Home - Dynomite Diesel: 1999-2003 Ford 7.3L Powerstroke Parts
Click on image to zoom

Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel

DDP.AENEW
Fits 1999-2003 Powerstroke Diesel 7.3 Liter
NOTE: This product has the following shipping restriction(s):
  • Not Legal For Sale Or Use In California
Was: $412.00
Sale: $391.40
Save: 5%
Save: $20.60

Customize Your Item

- Choose Core Option -
 * required
Qty:
NOTE: This product has the following shipping restriction(s):
  • Not Legal For Sale Or Use In California
Free Ground Shipping

Description

Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

Product Videos

https://www.youtube.com/watch?v=Dpq0FcyM34w

warranty

1 Year

Details

  • DDP.AENEW
  • DDP.AENEW
  • 671875112039
  • Dynomite Diesel
  • New

Shipping Information

  • Item Requires Shipping
  • 3.5 lbs.
  • W3.5000” x H3.5000” x L10.5000”
  • Free Ground Shipping

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.